IK-Group was awarded a fast track contract to design and fabricate a valve and PLR skid frame to be connected to an existing PLEM. The function of the skid frame to was to provide a valve isolation barrier, and PLR facility, to the gas export pipeline PLEM.
- 23 week lead time. Some 10 weeks+ faster than the customer's alternatives.
- Skid weight: 4 T.
- Design life: 7 years.
- Design pressure: 208 Barg.