After start-up of the asset, the operator discovered several offset welds in a super duplex piping system. IK-Group subsequently delivered a complete system consisting of integrity clamp and structural re-enforcement, in case of a failure of the system. The fast track project was delivered based on IK CBER system and our unrivaled repair systems know-how.
- Emergency response (CBER)
- Integrity clamp
- Structural clamp