Sealing Integrity Clamp for 10” x 6” Tie-in

EPC and installation of integrity clamp to seal off an external leakage on a water-cooling system in a Norwegian process plant.

Product/Service:

Pipe Intervention

Year:

September 2019

Location:

Northern Norway, Processing plant

Project Manager:

Roald Kolnes

During maintenance, the operator discovered a leakage in a 10x 6" piping system were the leak was in an existing golden weld with nearby pipes and obstructions. IK was contacted and delivered and installed an integrity clamp. The fast track project was delivered based on IK CBER system and our speciality knowhow of repair systems.

  • Emergency response CBER
  • Tie in split clamp
  • Integrity clamp