IK-Topside were approached after a client had found a corroded flange on two large tanks at a refinery plant in Norway. Our team of engineering experts designed two different types of clamps and delivered total of 37 repair clamps that were successfully delivered and installed in Q3/Q4 2022, saving the client time and money.
“This was an exciting project for us because of the high volume of identical clamps and to prepare an efficient installation plan for the site operation to avoid many crane operations.”
Pipeline Intervention Manager, Roald Kolnes